|
Diagnosis You want to process an object (for example, a BOM or document) withreference to the change number of an ECR. System Response The system checks the system status of the ECR (change header). Thesystem status is set to "locked", so you cannot process objects withreference to this change master record. Procedure You cannot change a change object with reference to this ECR unless thesystem status is changed ("Unlock"). Change ECR> |