|
Diagnosis You want to assign a revision level to the change status of thedocument. System Response The system checks whether the selcted change master contains theindicator A management record is required for each object> forthe Object type> document.Procedure This indicator is not set in the change master record. Before you can assign a revision level to this change status of thedocument using this change master, you have to enter this indicator inthe change master. |