Diagnosis You have activated the trace log. This setting is saveduser-specifically.
System Response The system cretaes the trace log> when you select anobject (for example, BOM) in an operational area (for example, materialrequirements planning).
After you have entered the validity data (dialog box for Parameter
entry>), the trace log is displayed.
The change status of the object for the validity dates is then
determined.
Procedure You can deactivate> the trace log by repeating the stepEnvironment -> Trace on/off>.