|
Diagnosis In the selected process message, the unit of measure &V1& has beenentered for the material &V2&. However, this unit of measure cannot beprocessed by the destination &V3& since
- it does not correspond to the base unit of measure or
any of the alternative units of measure stored in the materialmaster and
- since it cannot be converted into any of the units stored in the
material masterProcedure
- If the message has not yet been sent to another desintation, correct
and send it from the message monitor.
- Otherwise, manually post the data if necessary.
|