|
Diagnosis You use the Last p. lot assign.> (p. lot = partial lot) indicatorin the QM data for the operation or phase to specify that the lastinspection during production is planned and thus possibly also the lastassignment of partial lots. You must have set this indicator to enablethe sytem to propose the inspection point quantities when posting thegoods receipt for the order. Due to the settings made in the recipe, this process messages istransferred to QM but the Last p. lot assign.> indicator has notbeen set for the operation or phase of the process message.System Response During results recording for the operation or phase, the systemtransfers the reported quantity to the inspection point as the yield.When you post the goods issue in inventory management, however, thequantity is not> proposed. |