SAP Message CACSSESTD114 - Without change instructions, distribution of remun. &1 remains the same

Diagnosis
During the remuneration scheduling process step, the systemchecked if the settlement schedule for remuneration line &SYST-MSGV1&should be changed. The following steps were carried out:

  • Establish whether rescheduling is allowed.

  • Rescheduling is only triggered if the scheduling rule in the currentsettlement schedule allows changes (configuration of scheduling rule).
    • Check the agreement for settlement rescheduling.

    • The scheduling rule to be applied is determined, based on the latestversion of the business object attributes. Determine whetherrescheduling is necessary.
      • Determine whether rescheduling is necessary.

      • The system checks whether rescheduling could come up with differentscheduling results than those already in the settlement schedule.Rescheduling is not triggered if the same version of the same rule is tobe applied, based on current information, and the attributes of theremuneration line are the same as those on the database, and settlementschedule has not been changed. A settlement schedule is considered asbeing changed if more than one version of the settlement schedule headerexists.
        • Recalculation of the settlement schedule based on new information.

        • Starting from the business object start date in the document header ofthe remuneration line, the settlement schedule is recalculated on thebasis of the new settlement schedule rule (where applicable).
          • Compare the old and new version of the settlement schedule.

          • Processing takes place as a logical service that is implemented by thetool for settlement scheduling. Method 02 Change Settlement Schedule
            of object type class 25 is used. The old and new version of thesettlement schedule is transferred to the logical service. The standarddelivery of the logical service, method 02, accepts the new settlementschedule and compares items that have already been converted tosettlement items.
            The logical service did not come up with a proposed change in theCompare old and new version of settlement schedule process step.

            System Response
            The settlement schedule for remuneration &SYST-MSGV1& remains unchanged.