SAP Message CACSSESTD088 - Settlement schedule &1 for remuneration &2 already has current status

Diagnosis
The system has been instructed to recalculate the settlement schedulefor remuneration &SYST-MSGV2&. However a system check has proved that arecalculation is not necessary since it would achieve the same resultsas the existing settlement schedule. The system has checked anddetermined the following:

  • Settlement schedule:

  • Settlement schedule &SYST-MSGV1& has not changed since its creation.
    • Scheduling rule:

    • The rule to be used based on current information is identical to and has
      same version as the rule used when the settlement schedule was created.
      • Attributes:

      • The attributes of the remuneration line &SYST-MSGV2& (database fields)are identical to the attributes that would be used based on currentinformation.

        System Response
        The system is terminating the recalculation of settlement scheduling for
        remuneration &SYST-MSGV2&.