Diagnosis During remuneration scheduling based on settlement scheduling, the syste m has been instructed to determine a scheduling rule for remunerationline &SYST-MSGV1&. To do this, the determination of rules is started.Then the rule with the highest priority is selected from the overlap of'agreed' and 'found' scheduling rules. In the current case, there is noagreement for any of the scheduling rules found in the commissioncontract. Procedure Check the scheduling rules agreed on in the entitlement holders commissi on contract for remuneration &SYST-MSGV1&. Also check how thedetermination of scheduling rules are configured. The following factorsare relevant for determining the scheduling rule:
- Possible scheduling rules that are agreed for the commission contract
- Priority given to each scheduling rule in the commission contract, if mo
re than one rule exists
- Characteristic combination type of the standard agreement that is contai
ned in the standard contract for the commission contract for agreementcategory Settlement scheduling>
- Setting of the determination for the particular characteristic combinati
on type. Validity period information from the selection tables at thepoint when the commission case or manual document were processed can beused to locate scheduling rules. All criteria (fields) that are to beused in the determination must be included in the metastructure of theremuneration (_s_docrem>). Only fields of the remunerationline are used as selection attributes.
- There must be an overlap of 'agreed' and 'found' scheduling rules in the
course of determination.
|