SAP Message CACSSESTD069 - Settlement scheduling for remuneration line &1 is based on rule &2

Diagnosis
For remuneration line &SYST-MSGV1&, settlement schedule ruleSyst-msgv2 was determined for remuneration scheduling on the basis ofsettlement scheduling. The use of settlement schedule rule &SYST-MSGV2&is dictated by the contractual agreements for settlement scheduling andthe settings for the determination. The following factors are relevantfor determining the settlement schedule rule:

  • Settlement schedule rule options that are agreed for the commission
  • contract
    • Priority given to each settlement schedule rule in the commission
    • contract, if more than one exists
      • Characteristic combination type of the standard agreement that is
      • contained in the standard contract for the commission contract foragreement category Settlement scheduling.
        • Setting of the determination for the above characteristic combination
        • type. Validity period information from the selection tables at thepoint when the commission case or manual document were processed can beused to locate scheduling rules. All criteria (fields) that are to beused in the determination must be included in the metastructure of theremuneration (_s_docrem>). Only fields of the remunerationline are used as selection attributes.
          In the current case, settlement schedule rule &SYST-MSGV2& is the rulewith highest priority from the overlap of 'agreed' and 'found' rules.