Diagnosis The system was instructed to execute the tool function in the standardsystem of the logical services for the creation of a settlement schedulefor remuneration line &2, but an error occurred. During the check to seeif the remuneration entitlement that is ready for disbursement has beenscheduled correctly on the settlement schedule dates, the system foundover-/underscheduling for the &SYST-MSGV1& field (settlement scheduleitem). The over-/underscheduling is higher than one currency unit. Thesystem assumes that there is a calculation error. System Response Processing stops. Procedure For an analysis and solution of the problem, contact your systemadministrator. |