|
Diagnosis There is an inconsistency between the status of the worklist and thestatus of a processed task. The worklist has the status SuccessfullyProcessed>, yet a task was returned with the status Incorrect>.System Response The status of the worklist is set to Manual Processing Required>.Procedure Make sure that the functions called in the tool of the logical servicesset the status of the worklist and the status of the tasks processed inthe worklist consistently. |