Diagnosis For the transfer of entitlement &v3& it was specified that theentitlements should be paid out on the same dates. This means thatsettlement release should be based on the same rule. However, therelease rule &v2& used for the original contract is not> assignedto the receiving contract &v1&.System Response Transfer is not possible. Procedure Assign release rule &v2& to contract &v1&, or do not transfer the data.In this case the release rule and scheduling rule are redetermined. |