SAP Message CACSELT050 - Specify an enterprise commission contract for &1

Diagnosis
An enterprise commission contract must bespecified in the parameters, to which the difference between theremaining entitlement share and the transferred share is assigned.
Differences may result for the following reasons:

  • Rounding differences may have arisen when the entitlement or liability
  • was distributed.
    • The total assignment share does not equal 100%.

    • While transferring the entitlements, the system determined that the
    • entitlement has to be recalculated accordingto the agreements of the receiving contract. The entitlement calculatedin the process is different from the entitlement due for the contract.

      System Response
      The system does not create a transfer document because the parameters ofthe assignment set are incorrect.

      Procedure
      Specify an enterprise commission contract in the parameters of theassignment set to which any differences in the settlement share will beassigned.