SAP Message C9013 - Material and task list & do not belong to same company code

Diagnosis
You want to

  • allocate a material to task list &V1&

  • or
    • create task list &V1& with a material.

    • Task list &V1& in plant &V2& belong to a different company code as thematerial in plant &V3&. The plant data determines the company code.
      You can generally make cross-company code allocations in a routing.
      However, a company code check is set up in your system for the fiscalyear.

      Procedure

      • Select a material which belongs to the same company code as task list
      • V1 in plant v2
        or
        • when you create task list &V1&, make sure that the plant belongs to the
        • same company code as the material in plant &V3&.