SAP Message C7002 - Scheduling terminated: Check lot size unit of measure

Diagnosis
The lot size cannot be converted into the routing's unit of measure.

System Response
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX

Procedure
INCLUDE 'NA_ALLG_URSACHEN' OBJECT DOKU ID TX
RESET N1
Check the unit of measure that you have maintained in the routing.Change it if necessary.
Check the conversion factors specified in the material master. Changethem if necessary.