Diagnosis You want to change the valid-from date of the change master record. This is not possible, because characteristic &v1& means that &V2& is nolonger consistent. This is because object dependencies for characteristic &v1& havealready been changed with a change number on the new valid-from date(&V1&). System Response The system produces a message log with a list of the change objectsthat prevent a date shift. Procedure Please move the valid-from date of the change number to a differentdate. |