Diagnosis No currency key has been assigned to controlling area &V1& System Response You cannot use controlling area &V1& for planning, as planning takesplace in the area currency. Procedure Check whether your input was correct and enter the currency key forcontrolling area &V1& in the configuration menu for cost centeraccounting. |