SAP Message BP552 - Specify the project or a top WBS element of the project

Diagnosis
You want to plan a subhierarchy for project &V3&.
In plan profile &V1& of project &V3&, the indicator for "Bottom-UpPlanning" is set.
If this indicator is set, the function "Total Up" is executedautomatically in the structure planning for costs and revenues eachtime you save and check. The superior WBS element receives the total ofall plan values of the direct subordinate WBS element as the structureplan value.
Note:
As you execute a structure planning for a subhierarchy, the plan valuesare only totaled as far as the WBS element &V2& with which you accessedthe planning.

Procedure
The automatic totaling within the whole project or as far asTop-WBS-Element is then guaranteed if you access the structure planningwith project definition &V3& or a Top-WBS-Element of the Project.

Procedure for System Administration
You can switch off this message by using transaction OBA5 or bychanging the message category on the error message, warning orinformation message.

510586CJ40: bottom-up planning with subhierarchy