Diagnosis An important prerequisite for the use of a schedule is thespecification of the route and the route stages. Each vendor shippingpoint is represented by a connection point in the route stage. Thevendor number is maintainted as reference in the connection point. Thegoods receiving point is the last connection point in the routeindicating the end of the route. The goods receipt point is maintainedas reference in the last connection point. The entry of the references(vendor or goods receiving point) for a connection point are mandatory. System Response For the last connection point of the route, maintain a goods receivingpoint. Procedure For the definition of routes, you must process the following steps:
- Define the transportation connection points and maintain the
appropriate references.
- Define the routes and the route stages.
|