Diagnosis An important prerequisite for the use of a schedule is thespecification of a route and the route stages. Each vendor shipping point is represented by a connection point in theroute stage. The vendor number is maintained as reference in theconnection point. The receiving point represents the last point in the route andindicates the end of the route. The receiving point is maintained asreference in the last connection point. Entry of the references (vendor or receiving point) is obligatory for aconnection point. System Response First, maintain the route stages. Procedure To define routes, process the following steps:
- Define the transportation connection points and maintain the
appropriate references.
- Define the routes and the route stages.
|