Diagnosis You want to allocate costs manually, but this is only possible inversion zero. As you are working with transfer prices>, theallocation could be insufficient in version zero.Procedure
- If the message is an error message, execute automatic allocation.
- If the message is not an error message, check if it would be better to
use automatic allocation in spite of this, as this method is not ableto include transfer prices. In Customizing, you can change this message from an error message to awarning, or note, or you can deactivate it altogether. In theImplementation Guide (IMG), choose General Controlling>Change Message Control> (Work area: BK,message number: 223)
|