Diagnosis The controlling area currency &V1& is not managed in any of the areasof the asset under construction that is to be created. However, thiscurrency is required for the capital investment measure. System Response Error message: Creating the AuC or releasing the order/ WBS element isnot possible; or changing the asset under construction is not possible. Procedure Check if you manage the controlling area currency in one of thedepreciation areas in Asset Accounting, especially in asset class &V2&.If you do not, then define such a depreciation area. Make sure thatthis depreciation is active in asset class &V2&. You can save the order / WBS element if you remove the investmentprofile that was entered.
- If you are in the 'Change asset' transaction, check if you have
deactivated a depreciation area that manages controlling area currencyV1. re-activate this depreciation area.
|