Diagnosis You have chosen simulation period &V2& to &V3& for contract &V1&. Thissimulation period is not permissible for one of the following reasons:
- The start of the simulation period is after the end of the simulation
period
- The start of the simulation period is before the move-in date for the
contract
- The end of the simulation period is after the move-out date for the
contractSystem Response The contract cannot be simulated. Procedure The simulation period was calculated by method SIM_METHOD_DETERMINE ofBusiness Add-In>ISU_BI_MASS_SIMUL. Correct the coding of your BADI implementation.
|