Diagnosis The '&v1&' field in the Excel input file is assigned to a date field inthe asset master record. The value of the field (&v2&) was converted to the date '&v3&'.However, this is not a sensible date. Procedure Check the contents of the field in the input file and change them sothat they agree with the date format that is set. Or, if the '&v1&' field was incorrectly assigned to an amount field,create a new field assignment. Procedure for System Administration |