Diagnosis Consumption values or amounts from secondary installation &v1& arerequired for billing the primary installation>. Thebilling order of the secondary installation &v1& is simulated with thescheduled billing date> &v2& and thebilling transaction> &v3&. The consumption values andthe amounts are taken from the simulation document. However, thesimulation document is outsorted. |