Diagnosis Gas date &v4& is later than the meter reading date &v1& from device &v2& , register &v3&. This can happen if a default value 0 is entered for theGas Date Control in Months>> in the DefineAllocation Dates for Gas>> and the scheduled and actual meterreading dates are in different months.System Response Processing is cancelled. Procedure You have the following options:
- Select a default higher than 0 in the Define Allocation Dates for
Gas> table
- Use the enhancement Change Gas Date in Meter Reading Data
Processing>> (EDMMR002) to change the gas date to the meter readingdate when a meter reading result is entered.
|