Diagnosis You changed gas date &v1& in enhancement EDMMR002 (change the gas dateduring the processing of meter reading data). To ensure correctprocessing, the gas date must lie within the following thresholds:
- The gas date of the previous meter reading, &v2&, must lie before the
gas date
- The gas date of the subsequent meter reading, &v3&, must lie after the
gas dateSystem Response The changed gas date is not saved. INCLUDE ISU_VERARB OBJECT DOKU ID TX Procedure INCLUDE NA_SYSADMIN1 OBJECT DOKU ID TX Procedure for System Administration Change the coding in enhancement EDMMR002 to ensure that the aboveconditions are always met.
|