SAP Message AJ089 - Specify a date starting from &1 as the extrapolation date DOCUMENTATION NOTES DiagnosisYou have specified &v2& as the extrapolation date. This date is beforethe start of the next billing period (&v1&) for the contract.ProcedureSpecify an extrapolation date which is after the start of the billingperiod (&v1&) for the contract. 482005Mass simulation: Termination AJ089