SAP Message AJ089 - Specify a date starting from &1 as the extrapolation date

Diagnosis
You have specified &v2& as the extrapolation date. This date is beforethe start of the next billing period (&v1&) for the contract.

Procedure
Specify an extrapolation date which is after the start of the billingperiod (&v1&) for the contract.

482005Mass simulation: Termination AJ089