SAP Message AJ088 - Specify a date starting from &1 as the check date

Diagnosis
You have specified &v2& as the check date. This date is before thestart of the next billing period (&v1&) for the contract.

Procedure
Specify a check date which is after the start of the billing period (
V1) for the contract.