SAP Message AJ088 - Specify a date starting from &1 as the check date DOCUMENTATION DiagnosisYou have specified &v2& as the check date. This date is before thestart of the next billing period (&v1&) for the contract.ProcedureSpecify a check date which is after the start of the billing period (V1) for the contract.