Diagnosis The meter reading results corresponding to the meter reading order werenot recorded on the same day. The earliest and most recent meter reading results are from thespecified period. This means that it is not possible to determine the end of the billingperiod. System Response Processing is canceled. Procedure Ensure that all the meter reading results that are to be allocated tothe billing order are always taken on the same day. |