Diagnosis No scheduled meter reading date was found in the billing order for thespecified contract and scheduled billing date. The scheduled meterreading date is required in certain cases for determining the billingperiod. System Response Processing has been canceled. Procedure INCLUDE ISU_SAP OBJECT DOKU ID TX |