Diagnosis In a PM/CS order, you use external operations with theSubcontracting> indicator. For one or more components, you haveset the material provision indicator (MPI) to Rework Material toSubcontrator> or Rework Material from Subcontractor>. Duringmaintenance of the PM/CS order, if you clear the Subcontracting>indicator, you cannot use the MPI. The MPI must be blank.System Response You cannot save the PM/CS order. Procedure Use the Subcontracting >indicator to mark the external operationof the PM/CS order as a subcontracting operation. For all components in the order, ensure that the MPI is not >set. Remove the Subcontracting> indicator. |