Diagnosis There is a problem corresponding to the duration unit given in theoperation of the PM / CS order . The error can be caused by the following problems:
The unit is missing in the order
The dimension of the unit is not a time dimension (such as Hours or
Days)
The corresponding customizing entry (T006) is missing
System Response The CMC can not be started with this order.
Procedure There are two possibilities to avoid the error:
Check the corresponding order / operation and adjust the unit