Diagnosis When you use changeover method '1', the system compares thedepreciation for phase 1 in each year with the depreciation that wouldresult in phase 2. In the acquisition year, the system sets thedepreciation start date according to the period control in phase 2 whenit makes this comparison. If the depreciation start date according to the period control of phase2 is before the depreciation start date according to the period controlof phase 1, and the multiplication factor is relatively small, this cancause a changeover that takes place already in the acquisition year. If, in the above case, you do not want the changeover to take place inthe acquisition year, you have to enter the same period control inphase 2 as you entered in phase 1. System Response The data is saved. Procedure If necessary, change the period control so that it is the same bothbefore and after the changeover. This message relates to entry &v1& (chart of depreciation, depreciationkey, depreciation type, depreciation phase). Before the changeoverusing method 1, period control &v3& is used in depreciation key &v2&.After the changeover, period control &v4& is used. |