SAP Message ACRSL019 - & : Validity in periods has to be between 0 and 12 DOCUMENTATION DiagnosisThe planned life in periods is not between 0 and 12. You have to entera valid calendar month.System ResponseThe data is not saved.ProcedureChange multi-level method &v1& (client, chart of depreciation,multi-level method).