SAP Message 6F016 - Transfer posting of costs in update run is made

Diagnosis
You want to start the periodic posting in the production run withoutcarrying out a transfer posting of the costs at the same time. Since abackdated transfer posting is not possible, the data may not beconsistent if you do not select this option.

System Response
The transfer posting of the costs is always carried in the productionrun, regardless of the indicator in the selection screen.

Procedure
If you do not want to transfer the costs, you can limit the validity ofthe distribution in the agreement master data.