Diagnosis During the contract currency changeover, the system takes open items inthe original currency off the books (clearing posting) and posts themback in euros. In this case, the posting date for the clearing posting(&V1&) is before the posting date for the open items. This is notpermitted. System Response Processing is terminated. Procedure Enter &V2& or a later date as the posting date. |