SAP Message 6A554 - Enter apportionment unit or maintain planned cost distribution

Diagnosis
You want to carry out a rent adjustment as a result of a constructionmeasure. There are two ways of determining how the total costs of thework are distributed between the participating rental units.

  • Indirectly via an apportionment factor (such as "living area")

  • Directly by detailing the costs on the rental units

  • In this particular case you have entered an apportionment unit as wellas maintaining the cost distribution in the master data of theconstruction measure.

    System Response
    The system takes account of the apportionment unit and ignores the costdistribution details for the construction measure.

    Procedure
    If you want to carry out the cost distribution according to the dataentered for the construction measure, leave the "apportionment unit"field empty.