Diagnosis You want to carry out the current report (&V1&) in the background. System Response This is possible, but only if you define a corresponding job. Procedure To do this, proceed as follows: In the selection screen of this report, fill all fields with thenecessary values and then save it in a variant. To define a job, specify "&V1&" as the program name and enter the nameof your variant (execution without a variant is not possible). Specify the start date you require and save the job. Processing then occurs in the background on the specified date (->Define background job>). |