Diagnosis You want to change the assignment of real estate objects to assets.Correction items with a zero balance exist for the previous asset &V1&V2. the link to these correction items will be lost when theassignment is changed. System Response This is only a warning. Procedure If a reference to these correction items is still necessary, you mustreenter the old asset assignment or terminate the dialog. |