Diagnosis When copying planned orders from long-term planning to MRP, the systemdeletes existing planned orders in MRP that lie in the period forcopying. This is, however, not always possible. Planned order &V1& hasalready been partially confirmed, that is, it contains a quantity ofgoods received. Because of this, the system cannot delete the plannedorder during the copying of planned orders from long-term planning. System Response The system did not delete planned order &v1&. The planned order remainsin the period for copying. An additional element now exists in thespecified period to cover a requirement. Procedure Edit the planning results manually to correct any excess coverage bythe MRP run. |