Diagnosis There are two possibilities in this case:
- either you have already started the planning run for the plant and this
is being carried out at present
- or the planning run is still locked due to a blocking entry from the
previous planning run.Procedure In the second case, you must unlock the planning run. You do this asdescribed below: Make sure that no planning run is active as if a planning run is activewhen you try to unlock MRP, this could lead to incorrect results. Select Tools -> Administration Select Monitoring -> Lock entries
|