Diagnosis No period matching the PF master data could be found for this employeein the periods from &V1& to &V2&. The PC operationBVG wage> uses this as a referenceperiod to determine the total wage coordinated by the BVG between &V1&and &V2&. Probable reason: No employee record exists between &V1& and &V2& inIndividual Values infotype 0279.Procedure If the employee is registered without infotype 0279, you must create aposting with the value type LNB0 with a posting date between &V1& andV2. thus, you can determine the bvgbasis>. If this is not an option and at least one record exists in IndividualValues PF infotype 0279, notify your system administrator. |