Diagnosis The maximum weekly work schedule is calculated from the minimumaverage number of workdays per week (from T77S0) and the maximumnumber of hours worked per day. This last value can be determinedfrom the entry in the field "Work schedule per day" or thecorresponding T77S0 entry, if the screen field is empty. The entry in the field "Work schedule per day" or thecorresponding T77S0 entry, if this is larger, is taken as a minimumweekly work schedule. System Response Warning. |