|
Diagnosis The following inconsistency has been found in the relationship betweenobjects "&V1&" and "&V2&": The end date (&V3&) of the related objects " V2" is before the start date (v4) of the relationship. this meansthat the validity period of the related object comes before thevalidity period of the relationship. System Response Due to this inconsistency the report you started has been terminated. Procedure Decide which of the following alternatives would be useful and arepossible:
- Set the end date of the related object to after the start date of the
relationship.
- Set the start date of the relationship to before the end date of the
related object.
- Delete the relationship between the objects.
|