SAP Message 56208 - Trip duration is & days; a maximum of & days is allowed

Diagnosis
The trip entered has a duration of &V1& days. According to constantREIDR in the Travel Accounting constants, the maximum allowed durationfor a business trip is &V2& days.

Procedure
Check whether the entry is correct.
It may be necessary to complete IMG activityCheck Travel Accounting Constants.
If you do not have the necessary authorization, inform your systemadministrators so that the entry can be made in the table.