Diagnosis You want to explode the BOM for material &V3& with the change statusdenoted by revision level &V2&. However, there is no revision level &V2& for this material. Procedure You can define the explosion data as follows:
- Correct your entry in the Revision level> field.
If you want to see an overview of existing revision levels for materialV3, starting from the engineering change management menu, choosefunction Environment -> Revision level -> Display>. On the initial screen, enter material &V2&. You see a list of all theexisting revision levels, each of which denotes a change made with achange number.
- Enter a change number.
The system ignores both the valid-from> date and the revisionlevel in this case. The valid-from> date is taken from the changenumber.
- Enter the valid-from> date only.
|