|
Diagnosis You have entered a follow-up group for a BOM item. The follow-up groupis used to identify an item as a follow-up item - an item whichreplaces a discontinued item. System Response The system checks the material master record of the item. Thediscontinuation indicator> in the discontinuation data (MRP3view) of the material master record for this item is the value 1(simple/parallel discontinue). This value means that you must enter afollow-up material in the material master record.Procedure Since a follow-up material is maintained in the material master recordof this BOM item, the item is a discontinued material. Once a materialhas been defined as discontinued, you can no longer define the materialas a follow-up item for another item in a BOM. You can only define this material as a follow-up item if you change thevalue for the discontinuation indicator in the material master record.Otherwise, you have to enter a different follow-up item. |