Diagnosis One of the following situations triggered this error message: RESET N1 The BOM is allocated to more than one plant. Different discontinuationdata is defined in the different plants via the discontinuationindicator in material &V1&. You want to enter a discontinuation group. You want to enter a follow-up group. Procedure 1.) Check the material master records in the different plants. Define thesame discontinuation data in all plants. 2.) You can only enter a discontinuation group if the discontinuationindicator in the material master record (MRP 3 view) has the value 1(main material to be discontinued) or 3 (subordinate material to bediscontinued). 3.) You can only enter a follow-up group if the discontinuation indicatorin the material master record (MRP 3 view) does not> have thevalue 1 (main material to be discontinued). |