Diagnosis You want to allocate the BOM for a material that was configured withreference to configurable material &V1& in plant &V2& to plant &V3& However, different BOMs for configurable material &V1& exist in plantsV2 and v3. for this reason, you cannot allocate the bom to theplant. Procedure If you want to allocate the configured material to plant &V3&, theconfigurable material must have one> BOM in both plants. You mustdelete the second BOM. To do this, proceed as follows:
- Check the BOMs for the configurable material in plants &V2& and &V3&.
Decide which BOM plant is relevant to both plants and which BOM youwant to delete.
- Delete the BOM from one of the plants (change mode).
- Allocate the BOM for the configurable material to the plant in which
you deleted the BOM.
- You can now link the BOM of the configured material to the plant you
require.
|